ARLESEY RELIEF ROAD AND GATEWAY BRIDGE SCHEME
Project Details - May 2022 - December 2023
The 1.4km link road was built to provide access to a 950-home development in Chase Farm.
The project also shifts traffic from the busy Arlesey High Street onto the new road to ease congestion and reduce journey times for road users heading to the A507. As part of the scheme, dedicated cycleways and footways now sit alongside the carriageway and a new bridge over the A507 has completed a route from Arlesey to Etonbury Woods and local schools.
The bridge also features a viewing platform at tree canopy level.
Services Undertaken:
Site Engineering
Equipment Provided:
N/A
Asish, as a Senior Site Engineer, and Madhukar, as Assistant Engineer, collaborated seamlessly to assist with the construction of a linked road project, including a pedestrian bridge. With Ash's leadership and Madhukar's valuable contributions, we ensured the smooth execution of our site engineering services from start to finish. The construction of the linked road and pedestrian bridge exemplifies our commitment to delivering innovative and sustainable infrastructure solutions that benefit the community. At AKN Engineering we take pride in our team's ability to tackle complex projects, and our dedication to high-quality work is unwavering.